← diogenesgateway.com

INDIVIDUAL MCP TOOL

schedule_critical_path_tasks

Solves a task dependency DAG via the Critical Path Method (CPM) to compute ES/EF/LS/LF, Total Float/Slack, optimal makespan, and the Critical Path.

diogenesgateway.comnone authenticationAvailability not checked

LIVE ENDPOINT

https://diogenesgateway.com/mcp/context-code-solver

No auth detected

Connect to this endpoint to inspect the live schema for schedule_critical_path_tasks and invoke it with your own arguments.

Indexed input schema

{}

Risk classification

Potential side effects detected · medium confidence · heuristic, not a guarantee.

  • A tool name or description suggests sending messages.

Parent server

diogenesgateway.com

CONNECT WITH APPROVAL

Client installation

Review this server and its permissions before adding it. Secret placeholders must be set locally.

Codex

~/.codex/config.toml

[mcp_servers.diogenes-edge-gateway]
url = "https://diogenesgateway.com/mcp/context-code-solver"
enabled = true
Claude Code

.mcp.json

{
  "mcpServers": {
    "diogenes-edge-gateway": {
      "type": "http",
      "url": "https://diogenesgateway.com/mcp/context-code-solver"
    }
  }
}
Claude Desktop

Settings → Connectors → Add custom connector

Name: diogenes-edge-gateway
Remote MCP URL: https://diogenesgateway.com/mcp/context-code-solver

Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.

Cursor

.cursor/mcp.json

{
  "mcpServers": {
    "diogenes-edge-gateway": {
      "url": "https://diogenesgateway.com/mcp/context-code-solver"
    }
  }
}
Visual Studio Code

.vscode/mcp.json

Add to Visual Studio Code
{
  "servers": {
    "diogenes-edge-gateway": {
      "type": "http",
      "url": "https://diogenesgateway.com/mcp/context-code-solver"
    }
  }
}
Generic MCP

Client-specific MCP configuration

{
  "name": "diogenes-edge-gateway",
  "transport": "streamable-http",
  "url": "https://diogenesgateway.com/mcp/context-code-solver"
}
MCP Inspector

Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.

Related tools

  • diff_agent_memory_checkpoint — Computes structural diffs between two agent state snapshots ('added_keys', 'mutated_keys', 'removed_keys'), flags boolean belief contradictions, generates an RFC 7396 JSON Merge Patch delta, and computes a canonical checkpoint hash.
  • prune_context_skeleton — Compresses large source files, logs, or transcripts by 50–80% to fit an LLM context budget while preserving 100% of function/class/type signatures, imports, error frames, and query-matched lines.
  • plan_context_token_budget — Counts subword BPE tokens across prompt segments, detects high-priority instructions trapped in the 35%–72% Lost-in-the-Middle attention trough, and calculates USD/satoshi costs across frontier LLMs.
  • rerank_hybrid_rag_chunks — Reranks and deduplicates candidate RAG or retrieval passages against a search prompt using Okapi BM25 (k1=1.
  • apply_fuzzy_code_patch — Applies unified diffs (@@ .
  • analyze_ast_symbol_graph — Static lexer and AST parser only (zero execution or evaluation): extracts imports, exports, classes, interfaces, and functions with line numbers, intra-file call edges, McCabe cyclomatic complexity, and Halstead volume across TypeScript, Python, Rust, Go, and Move.
  • audit_module_dependency_cycles — Runs Tarjan's Strongly Connected Components (SCC) algorithm on a module import map to detect circular dependencies, compute parallel topological build waves, and trace downstream change blast radius.
  • isolate_stacktrace_root_cause — Parses noisy CI/terminal logs and multi-language stack traces (Node/TS, Python, Rust, Go), strips node_modules/stdlib frames to isolate the innermost failing user-code frame, and clusters repetitive logs into Drain templates.