INDIVIDUAL MCP TOOL
get_usage
What the credential on this connection is allowed to do: the tier it resolves to (anonymous, sandbox, test key, or a live key on a plan), the per-minute burst, the daily or monthly allowance, and whether calls bill.
LIVE ENDPOINT
https://www.permitbird.com/api/mcp
Connect to this endpoint to inspect the live schema for get_usage and invoke it with your own arguments.
Indexed input schema
{}Risk classification
Inferred read-only · medium confidence · heuristic, not a guarantee.
- A tool name, description or schema mentions credentials.
Parent server
CONNECT WITH APPROVAL
Client installation
Review this server and its permissions before adding it. Secret placeholders must be set locally.
Codex
~/.codex/config.toml
[mcp_servers.permitbird]
url = "https://www.permitbird.com/api/mcp"
enabled = true
Claude Code
.mcp.json
{
"mcpServers": {
"permitbird": {
"type": "http",
"url": "https://www.permitbird.com/api/mcp"
}
}
}
Claude Desktop
Settings → Connectors → Add custom connector
Name: permitbird
Remote MCP URL: https://www.permitbird.com/api/mcp
Add this remote URL as a custom connector in Claude Desktop. Availability depends on the user plan and workspace policy.
Cursor
.cursor/mcp.json
{
"mcpServers": {
"permitbird": {
"url": "https://www.permitbird.com/api/mcp"
}
}
}
Visual Studio Code
.vscode/mcp.json
Add to Visual Studio Code{
"servers": {
"permitbird": {
"type": "http",
"url": "https://www.permitbird.com/api/mcp"
}
}
}
Generic MCP
Client-specific MCP configuration
{
"name": "permitbird",
"transport": "streamable-http",
"url": "https://www.permitbird.com/api/mcp"
}
MCP Inspector
Run the official MCP Inspector locally and enter the indexed Streamable HTTP endpoint.
Related tools
determine_nwp_pathway— Determine which of the 57 US Army Corps of Engineers nationwide permits (2026 reissuance, 91 FR 768, effective 15 March 2026) could authorise a project's impact to a wetland, stream or other water of the United States, whether a pre-construction notification is triggered, and what still needs checking at the district and state Section 401 layers.lookup_nationwide_permit— The compiled record for one nationwide permit: title, summary, acreage limit (including the tidal/non-tidal split where the permit sets one), whether a pre-construction notification is always, never or conditionally required, and the source citation.list_nwp_reference_data— The reference sets behind determine_nwp_pathway: all 38 USACE districts (name, division, member states, whether regional conditions are compiled), all 54 states/territories (whether the Section 401 certification is compiled), or the activity-to-candidate-permit mapping.determine_stormwater_permit— Determine which NPDES stormwater permit governs a construction or industrial site, and what that permit requires of it.get_stormwater_requirements— The requirements for a site: inspection frequency, stabilisation deadlines, Notice of Intent and Notice of Termination deadlines, corrective-action windows, record retention and buffer rules, each citing the permit section it came from.get_preparer_credential— Whether a state requires a credentialed preparer (California's Qualified SWPPP Developer, and the analogous credential elsewhere) to prepare or sign a stormwater pollution prevention plan, and whether that requirement bites for a site of this size.list_jurisdictions— Every state, territory and DC we hold a row for: NPDES authorisation status, the governing permit and its number, the agency name and URL, and the preparer-credential gate.